A14 C2H – Planned road closures w/c 29 November 2021

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 9pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Wednesday 1 December 9pm to 6am

• Grafham Road overbridge (over the A1)
Vehicles on the Brampton side will be diverted through Brampton via Park Road, to the B1514 and onto the A1 southbound to Buckden roundabout. From here the diversion will continue into Grafham via the B661 and Buckden Road to re-join Grafham Road.

Vehicles on the Grafham side of the bridge closure will follow this diversion in reverse.

Sunday 5 December 12.01am to 8pm

• B1514 Brampton Road
between the RingGo car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514.

Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://nationalhighways.co.uk/our-work/a14-cambridge-to-huntingdon/