A14 H2C – planned closures w/c 1 March 2021

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 9pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Thursday 25 February 8am to Friday 12 March 6pm

• Cambridge Road, Fen Drayton at its junction with A1307 eastbound
Vehicles in Fen Drayton will be diverted via Swavesey Road, Rose & Crown Road and Buckingway Road to the A1307 at Swavesey. Vehicles on the A1307 eastbound will be directed to continue on the A1307 eastbound to Swavesey and via Buckingway Road, Rose & Crown Road and Swavesey Road for access to Fen Drayton

Monday 1 to Thursday 4 (four nights)
• B1514 Brampton Road between station car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

Friday 5 9pm to Sunday 7 8am (35 hours)
• B1514 Brampton Road between station car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned closures w/c 22 Feb 2021

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements
We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Monday 22 to Friday 26 (five nights)

• Hinchingbrooke Park Road loop
Vehicles wishing to travel towards Brampton will be diverted via Huntingdon Ring Road and then back along the B1514 Brampton Road.
Vehicles travelling from Huntingdon will be diverted to continue on B1514 Brampton Road westbound to the roundabout and return eastbound to then turn left into Hinchingbrooke Park Road

Thursday 25 February 8am to Friday 12 March 6pm
• Cambridge Road, Fen Drayton at its junction with A1307 eastbound
Vehicles in Fen Drayton will be diverted via Swavesey Road, Rose & Crown Road and Buckingway Road to the A1307 at Swavesey. Vehicles on the A1307 eastbound will be directed to continue on the A1307 eastbound to Swavesey and via Buckingway Road, Rose & Crown Road and Swavesey Road for access to Fen Drayton

Saturday 27 February 7am to Monday 1 March 6am (47 hours)
• A1198 north and south bound between the A14 Godmanchester junction 23 dumbbell roundabouts
Vehicles on the north side of the A1198 closure will be diverted east on the A1307 to Swavesey. From here drivers can access the A14 westbound or can continue onto the A14 eastbound to Histon junction 32, exit and return on the A14 westbound for access to the A428
Vehicles on the south side of the A1198 closure will be diverted east on the A428 at Caxton Gibbet to Histon junction 32, exit and return on the A14 westbound to Swavesey junction 24 and exit for the A1307
• A14 eastbound Godmanchester junction 23 eastbound exit slip
Vehicles will be diverted to continue on the A14 eastbound to Swavesey junction 24 and exit here for access to the A1307
• A14 westbound Godmanchester junction 23 westbound entry slip
Vehicles from the north of the A1198 will be diverted east on A1307 to Swavesey to access the A14 westbound via Swavesey junction 24

Saturday 27 8am to 5pm
• B1514 Brampton Road between station car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – planned closures w/c 15 Feb 2021

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements
We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Monday 15 to Tuesday 16 (two nights)
• B1050 Hattons Road southbound between Longstanton and Bar Hill junction 25
Vehicles will be diverted via Willingham, Rampton, Cottenham and Oakington onto the A1307
• The jug handle between A1307 and B1050 Hattons Road
Vehicles on the A1307 wishing to access the B1050 Hattons Road will be diverted via Oakington, Cottenham, Rampton and Willingham for access to Longstanton and Northstowe
Vehicles on the A1307 wishing to access Bar Hill will be diverted westbound to Swavesey and onto the A14 eastbound to exit at Bar Hill junction 25

Saturday 20 7am to Monday 22 6am (47 hours)
• A1198 north and south bound between the A14 Godmanchester junction 23 dumbbell roundabouts
Vehicles on the north side of the A1198 closure will be diverted east on the A1307 to Swavesey. From here drivers can access the A14 westbound or can continue onto the A14 eastbound to Histon junction 32, exit and return on the A14 westbound for access to the A428
Vehicles on the south side of the A1198 closure will be diverted east on the A428 at Caxton Gibbet to Histon junction 32, exit and return on the A14 westbound to Swavesey junction 24 and exit for the A1307
• A14 eastbound Godmanchester junction 23 eastbound exit slip
Vehicles will be diverted to continue on the A14 eastbound to Swavesey junction 24 and exit here for access to the A1307
• A14 westbound Godmanchester junction 23 westbound entry slip
Vehicles from the north of the A1198 will be diverted east on A1307 to Swavesey to access the A14 westbound via Swavesey junction 24

Saturday 20 9pm to Sunday 21 8am (11 hours)
• Brampton Road B1514 between station car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home

A14 C2H – Planned road closures w/c 8 Feb 2021

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures
Monday 8 to Wednesday 10 (three nights)
• A1(M) southbound between junction 14 and Alconbury entry slip
Vehicles will be diverted onto the A1307 spur to Spittals and west on the A141 to re-join the A1 at Brampton Hut or for access to the A14

Thursday 11 to Friday 12 (two nights)
• A1307 eastbound spur between A1(M) junction 14 and Rusts Lane, Alconbury exit slip
Vehicles will be diverted to continue on the A1 southbound to Brampton Hut roundabout and east on the A141 to Spittals
• A1 northbound Brampton Hut exit slip
Vehicles will be diverted to continue on the A1 to Alconbury and return on the southbound carriageway for access to Brampton Hut roundabout and the A141

Saturday 13 OR Sunday 14* 5am to 11.59pm (19 hours)
• Brampton Road B1514 between station car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

*exact date TBC on Monday 8 February

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 1 Feb

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Monday 1 to Wednesday 3 (three nights)
• A1(M) southbound between junction 14 and Alconbury entry slip
Vehicles will be diverted onto the A1307 spur to Spittals and west on the A141 to re-join the A1 at Brampton Hut or for access to the A14

Thursday 4 to Friday 5 (two nights)
• A1307 eastbound spur between A1(M) junction 14 and Rusts Lane, Alconbury exit slip
Vehicles will be diverted to continue on the A1 southbound to Brampton Hut roundabout and east on the A141 to Spittals

Sunday 7 5am to 11.59pm (19 hours)
• Brampton Road B1514 between station car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 18 January 2020

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Monday 18 to Thursday 21 (four nights)
• B1514 Brampton Road between the Hinchingbrooke Park Road eastbound junction and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, Ermine Street B1044 to Spittals roundabout, A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.
Residents living between the closure points will be provided with an escort
Monday 18 to Tuesday 19 (two nights)
• A10 north and southbound between Milton junction 33 and Butt Lane
Vehicles travelling south on the A10 will be diverted to exit to the A142 at Ely and onto the A14 at Newmarket junction 37. Vehicles travelling north will be diverted east on the A14 to junction 37 and onto the A142 to re-join the A10 at Ely.

Friday 22 to Saturday 23 (two nights)
• B1514 Brampton Road between Hinchingbrooke Park Road and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, Ermine Street B1044 to Spittals roundabout, A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.
• Hinchingbrooke Park Road between the loop and Brampton Road
Vehicles will be diverted via Hinchingbrooke Park Road loop onto B1514 Brampton Road. Access to Huntingdon will be via A141 to Spittals and onto Ermine Street B1044

Saturday 23 5am to 11.59pm (19 hours)
• Brampton Road B1514 between station car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 11 January

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures
Monday 11 to Thursday 14 (four nights)
• Hinchingbrooke Park Road access to B1514 Brampton Road eastbound
Vehicles will be diverted to turn right onto B1514 Brampton Road to the Brampton village roundabout, and return on Brampton Road for access to Huntingdon

Monday 11 to Tuesday 12 (two nights)
• A14 westbound Bar Hill junction 25 exit slip
Vehicles will be diverted to continue on the A14 westbound to Swavesey junction 24b and return on the eastbound carriageway
• A14 westbound Cambridge Services/Boxworth junction 24a exit slip
Vehicles will exit at junction 24b and use the access road via the first exit at the roundabout for the Services or Boxworth

Wednesday 13 to Friday 15 (three nights)
• B1050 Hattons Road north and southbound between Longstanton roundabout and Bar Hill junction 25 gyratory (including jug handle between B1050 and A1307)
Vehicles will be diverted onto the A1307 to Oakington and via Cottenham, Rampton and Willingham for access to Longstanton and Northstowe
• A14 eastbound Bar Hill junction 25 exit slip
Vehicles will be diverted to continue on the A14 and exit to A1307 Huntingdon Road and re-join the A14 on the westbound carriageway at Girton, to then exit to Bar Hill
• A14 eastbound Bar Hill junction 25 entry slip
Vehicles will be diverted west on the A14 to Swavesey junction 24b to access the eastbound A14 from here

Thursday 14 to Friday 15 (two nights)
• M11 northbound junction 13 to A14 westbound Girton junction 31
Vehicles will be diverted via A1303 westbound to the A428 and northbound on A1198 at Caxton Gibbet to re-join the A14 westbound at Godmanchester junction 23

Friday 15 (one night)
• A1 northbound up and over closure at Brampton Hut
Vehicles will be diverted via the A1 northbound exit and entry slips at Brampton Hut to re-join the A1
• Hinchingbrooke Park Road between the loop and Brampton Road
Vehicles will be diverted via the emergency access onto Brampton Road westbound

Friday 15 11.59pm to Monday 17 6am
• A14 westbound Brampton Interchange junction 22 to A1 northbound free flow link
Vehicles will be diverted to continue on the A14 to Thrapston junction 13, north on A605 to join the A1(M)

Friday 15 9pm to Sunday 17 12.01am (27 hours)
• B1514 Brampton Road between station car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 4 January

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Wednesday 6 to Friday 8 (three nights)
• B1514 Brampton Road between Hinchingbrooke Park Road and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, Ermine Street B1044 to Spittals roundabout, A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.
• Hinchingbrooke Park Road between the loop and Brampton Road
Vehicles will be diverted via Hinchingbrooke Park Road loop onto B1514 Brampton Road. Access to Huntingdon will be via A141 to Spittals and onto Ermine Street B1044

Saturday 9 (one night) 9pm – 8am
• Brampton Road B1514 between station car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, St Peters Road to A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 21 December

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures

Thursday 24 9pm to Sunday 27 5am (56 hours)
• B1514 Brampton Road between RingGo car park and Edison Bell Way

– Vehicles on the Huntingdon town centre side will be diverted onto the ring road, Ermine Street B1044 to Spittals roundabout, A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514.

– Vehicles on the Brampton side of the closure will follow this diversion in reverse.

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/

A14 C2H – Planned road closures w/c 14 December

A14 Cambridge to Huntingdon, Cambridgeshire: major improvements

We are currently carrying out finishing works for which we need to close lanes or carriageways on the A1, A14 and some local roads at times, usually overnight between 8pm and 6am, unless otherwise stated. A clearly signed diversion route will always be in place for closures.

For this week, the planned closures are:

Full closures
Monday 14 to Friday 18 (five nights)
• B1514 Brampton Road between Ring&Go car park and Edison Bell Way
Vehicles on the Huntingdon town centre side will be diverted onto the ring road, Ermine Street B1044 to Spittals roundabout, A141 west to Brampton / Brampton Racecourse junction and into Brampton via B1514. Vehicles on the Brampton side of the closure will follow this diversion in reverse.
• Hinchingbrooke Park Road loop
Vehicles will be diverted via the temporary right turn onto Brampton Road

Monday 14 to Tuesday 15 (two nights)
• A1307 westbound between St Ives and Godmanchester
Vehicles will be diverted east on A1307 to Swavesey and onto the A14 westbound at junction 24, exit at Brampton Interchange junction 22 onto A1 northbound to Brampton Hut roundabout. From here, return south on the A1 and onto the A14 eastbound at Brampton Interchange and exit at junction 23 onto the A1198

Monday 14 (one night)
• A1307 outbound from Girton College, Huntingdon Road to the first roundabout under the M11 roundabout
Vehicles will be diverted via the B1049 to Histon junction 32 and the A14
• A1307 both directions between Dry Drayton roundabout and Girton roundabout /A14 westbound entry slip 8pm – 2am
Vehicles will be diverted via the A14 to Bar Hill junction 25 for access to the A1307 into Cambridge.
• Dry Drayton overbridge southbound between Oakington roundabout and Dry Drayton roundabout 2am – 6am
Vehicles will be diverted via A1307 to Bar Hill junction 25 and A14 to exit for A1307 at Girton junction 31

Tuesday 15 (one night)
• A1307 both directions between Buckingway roundabout, Swavesey and Bar Hill jug handle 8pm – 11pm
Vehicles will be diverted via the A14 between Swavesey junction 24 and Bar Hill junction 25. Lolworth residents will be escorted to and from Buckingway roundabout
• A1307 both directions between Bar Hill jug handle and Oakington roundabout 11pm – 5am
Vehicles will be diverted via the A1307 and A14 between Bar Hill junction 25 and Girton junction 31

Friday 18 (one night)
• A14 eastbound between Godmanchester junction 23 and Swavesey junction 24
Vehicles will be diverted onto A1198 northbound and A1307 eastbound to rejoin the A14 at Swavesey junction 24
• A14 westbound between Swavesey junction 24b and New Ellington junction 21
Vehicles will be diverted onto A1307 to Godmanchester, south on A1198, west on A428, and north on the A1 to re-join the A14 via Brampton Hut

For more information about this scheme, visit https://highwaysengland.co.uk/a14-cambridge-to-huntingdon-improvement-scheme-home/